Genetic Algorithms for Construction Time-Cost-Quality Trade-Off: A Road Project Case Study

Authors

  • Mariarosa Sorrentino University of Bologna

DOI:

https://doi.org/10.6092/issn.2036-1602/4080

Keywords:

Construction Management, Key Performance Indicators (KPIs), Time-Cost-Quality trade-off analysis, road construction, Genetic Algorithms (GAs), Multi-objective Optimization

Abstract

Construction projects must satisfy time cost and quality requirements and Project Management is basically focused on this trade-off. In fact, in every project these three parameters are interdependent:  it’s impossible to change an element without conditioning at least one of the other two. The paper presents the development of a practical and automated system that uses an artificial intelligence technique for the planning of an infrastructural construction work, with the aim of optimizing time-cost-quality simultaneously. The model is developed as a multi-objective genetic algorithm to provide the capability of quantifying and considering quality in construction optimization. The purpose is to provide planners a useful technique to explore all possible project configurations.

References

American Society of Civil Engineers- ASCE (2002), “Report card: Reports and statistics.”, [http://www.asce.org/reportcard/]

Allodi Daniela (2008), Project management per l’Architettura, Franco Angeli, Milano

Archibald Russell D. (2004), Project Management - La gestione di Progetti e Programmi Complessi, Franco Angeli, Milano

Bragadin Marco A., Kahkonen Kalle (2013), Quality Evaluation of Construction Activities for Project Control, JOURNAL OF FRONTIERS IN CONSTRUCTION ENGINEERING, Mar. 2013, Vol. 2 Iss. 1, pp. 17-24

Bragadin Marco Alvise (2012), Quality Breakdown Structure per la Costruzione, ISTEA

Bragadin Marco Alvise (2011), La Programmazione dei Lavori con i Metodi Reticolari, Maggioli Editore, Santarcangelo di Romagna

Bragadin Marco Alvise (2008-2009), Programmazione Operativa, Appunti di lezione del Corso di organizzazione del Cantiere, Bologna

Building and Construction Authority (2008), CONQUAS The BCA Construction Quality Assessment System, Building and Construction Authority, Singapore

Caron Franco (2009), Gestione dei grandi progetti di ingegneria – il project management in azione, Isedi, Milano

Coello, C. C. (2000), An updated survey of GA-based multiobjective optimization techniques, ACM Comput. Surv., 32(2), 109–143

Daisy X.M. Zheng, S.Thomas Ng, Mohan M. Kumaraswamy, M.ASCE (2004), Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization, Journal of construction engineering and management

Daisy X.M. Zheng, S.Thomas Ng, Mohan M. Kumaraswamy, Applying genetic algorithm techniques for time-cost optimization, Department of Civil Engineering, University of Hong Kong, Pokfulam Road, Hong Kong

El-Rayes Khaled, Kandil Amr (2005), Time-Cost-Quality Trade-Off Analysis for Highway Construction, JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT © ASCE, pag 477-486, April 2005

Galbraith, J.K. (1967), The New Industrial State, Princeton University Press, U.S.

Goldberg, D. E. (1989), Genetic algorithms in search, optimization, and machine learning, Addison–Wesley, New York

Kandil, A., El-Rayes, K. (2006), MACROS: Multiobjective Automated Construction Resource Optimization System, Journal of Management in Engineering, 22 (3), 126-134

Kerzner H. (2009), Project Management - Pianificazione, scheduling e controllo dei progetti, Hoepli, Milano

Key Performance Indicators (KPI) Working Group (2000), KPI report for the Minister of Construction, Department of the Environment, Transport and the Regions, London, U.K.

PROJECT MANAGEMENT INSTITUTE - PMI (2004), A guide to the Project Managemet Body of Knowledge (PMBOK Guide)

Randy L. Haupt, Sue Ellen Haupt (2004), “Practical Genetic Algorithms”, John Wiley & Sons, Hoboken, New Jersey

Rigamonti G. (2001), La Gestione dei Processi di Intervento Edilizio: Tecniche e strumenti di project management e construction management, UTET, Torino

San Cristòbal Josè Ramòn (2009), “Time, Cost and Quality in a Road Building Construction”, JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT © ASCE, pag 1271-1274, November

Simone Andrea (2013), “S.P.4: Verifica Pavimentazioni”, Relazione tecnica, Bologna, maggio 2013

Simone Andrea, Vignali Valeria, Appunti di lezione, Corso di Costruzione di Strade, Ferrovie ed Aeroporti, Dipartimento DICAM, Università di Bologna.

Downloads

Published

2013-10-17

How to Cite

Sorrentino, M. (2013). Genetic Algorithms for Construction Time-Cost-Quality Trade-Off: A Road Project Case Study. IN_BO. Ricerche E Progetti Per Il Territorio, La Città E l’architettura, 4(2), 163–176. https://doi.org/10.6092/issn.2036-1602/4080