[1]
Sorrentino, M. 2013. Genetic Algorithms for Construction Time-Cost-Quality Trade-Off: A Road Project Case Study. IN_BO. Ricerche e progetti per il territorio, la città e l’architettura. 4, 2 (Jan. 2013), 163–176. DOI:https://doi.org/10.6092/issn.2036-1602/4080.